Project Case Library
Industrial Filtration Project Cases
Real Site Evidence for Mining & Slurry Dewatering Projects
Review selected Hexin project records by material, equipment type, application challenge, and delivery scope. Compare application conditions and delivery scope when planning a similar filtration, thickening or tailings dewatering project.
View Project CasesSelected Filtration Project Cases
Use these project records to compare equipment application, treated material, site context, and the data needed for a similar technical proposal.

Phosphor Tailings EPC Project
A phosphor tailing slurry project involving continuous filtration equipment, project delivery support, and solid-liquid separation for mining and compound fertilizer production.
View Case ->
Wengfu Group Dry Stack Project
A tailings dry stack filtration project for continuous slurry dewatering, cake discharge, and process support in phosphate and fertilizer production.
View Case ->
Guangxi Gaofeng Thickener Project
A polymetallic mine thickening project involving material concentration improvement, process water collection, and site-based solid-liquid separation support.
View Case ->
Tongbai 120 m2 Ceramic Filter Project
A ceramic filtration project showing equipment scale, continuous operation context, and concentrate dewatering support for mineral processing plants.
View Case ->
Huaxi Gaofeng Mining Project
A mining site filtration case focused on field operation context, equipment application, and project data needed for similar filtration support.
View Case ->
Gold Mine Belt Filter Project
A gold mine belt filter case for flotation tailings dewatering, dry discharge process support, and continuous solid-liquid separation in mineral processing.
View Case ->Browse by Project Type
Planning a Similar Filtration Project?
Send us your material type, capacity, target cake moisture and project country. Hexin can help evaluate suitable equipment and project support options.
Use These Cases as a Reference
Material & Application
Tell us your slurry type, current process, solids content, and whether the project is for tailings, concentrate, sludge, or wastewater treatment.
Capacity & Moisture Target
Share hourly or daily capacity, current moisture, target cake moisture, washing requirement, and continuous operation needs.
Equipment & Project Scope
Include preferred equipment type, project country, site conditions, and whether you need selection support, quotation, or EPC project discussion.